Project Type:
Specialised Research Facility
Location:
766-780 Elizabeth Street, Melbourne
Description of Works
Two and a half level basement works including; traditional bored pier works to site perimeter walls, basement bulk excavation and battering works, capping beam, shotcrete walls and temporary ground anchors. Stabilisation works to the existing PDI Centre Building.
Client:
KANE Constructions

