Project Type:Build to Rent – Residential Use Building Location:25-35 River Boulevard, Richmond. Description of Works: Large scale contamination project, with over 70,000 tonnes of material, followed by a 10,000m2 Single-level basement package including; pre-drilled bored pier works to basement perimeter drilled in ex-tip material, basement bulk excavation works, capping beam, shotcrete walls, temporary ground anchors and Foundation Piling Works (over …
Richmond Football Club – Punt Road Oval, Re-Development, Richmond.
Project Type:Club Re-Development – Richmond Football Club (AFL & AFLW). Location:Punt Road & Brunton Avenue, Richmond. Description of Works: Stage 1 Works: Site Set-Up and Access Works, Two-level basement works including; Traditional bored pier works to site perimeter, basement bulk excavation works, perimeter capping beam, shotcrete walls and temporary ground anchors. Followed by a complete Foundation Piling Package to the …
450 Gore Street, Fitzroy.
Project Type:Residential Apartments Location:450 Gore Street, Fitzroy. Description of Works: Two-level basement works including; core-drilled bored piers to site perimeter in rock, basement bulk excavation in basalt rock, capping beam, shotcrete walls (including blinding layer and full waterproofing to basement habitable areas/walls), temporary ground anchors & external foundation piling works. Finished with the detailed excavation of the in-ground footings package. …
‘Next DC – M2 Data Centre Hall’ Sharps Road & Barrie Road, Tullamarine.
Project Type:Data Centre – Rain-Garden Works Location:Sharps Road & Barrie Road, Tullamarine. Description of Works: Rain-garden works package, with removal of existing raingarden and associated plumbing, back-filling of site area under Level 1 supervision and installing high performance/loaded foundation piles. Followed by tank slabs, plinths and walkway areas to complete the new raingarden area for recycling water and cooling/ventilation of …
‘Dux Churchill’ 34-38 Bond Street, Ringwood.
Project Type:Retirement Living – Apartments Location:34-38 Bond Street, Ringwood. Description of Works: Two-level basement works including; traditional bored piers to site perimeter, basement bulk excavation, capping beam, shotcrete walls, temporary ground anchors & external foundation piling works. Finished with the full in-ground footings package and storm-water storage tank temporary works. Client: Maben Group
MLC Sports Precinct Redevelopment, Kew.
Project Type:School Aquatic Centre Re-Development Location:207 Barkers Road, Kew. Description of Works: Stage 1 Works: Demolition & Site Set-Up and Access Works, Bulk Excavation, Foundation Piling, Shotcrete Works, Pool Piles, Engineered Batters, Detail Excavation & F/R/P of all in-ground footings and all ground slab and pool concourse slab works. Stage 2 Works: Two-level basement works including; Traditional bored pier works …
525 Church Street, Richmond.
Project Type:Commercial & Residential Use Building Location:525 Church Street, Richmond. Description of Works: Two-level basement works including; traditional bored pier works to site perimeter drilled in rock, basement bulk excavation works (including hydraulic hammers), capping beam, shotcrete walls (including blinding layer & waterproofing membrane), temporary ground anchors, detail excavation & F/R/P of all in-ground footings and all ground on slab …
‘Melbourne Grammar School’ 75 Domain Road, Melbourne.
Project Type:Centre For Humanities Location:75 Domain Road, Melbourne. Description of Works: Contamination remediation and removal works, construction of all amenities hardstands, laydown area and crane hardstand works. Construction of a two-level basement, including; traditional bored piers to site perimeter, basement bulk excavation, capping beam, shotcrete walls, temporary ground anchors & external/internal foundation piling works. Client: KANE
‘Casey Monash Hospital’ Multi-Deck Carpark, Berwick.
Project Type:Multi-Deck Carpark Construction Location:62-70 Kangan Drive, Berwick. Description of Works: Single – level basement cut into an existing battered earth-face. Works included Foundation Piling to building footprint, bulk excavation works, retention piles, capping beam, shotcrete walls and engineered sleeper retaining walls to external areas and walkways. Client: L.U.Simon Builders
Yarra’s Edge – Tower 9, Docklands
Project Type:Residential Apartment Building Location:Tower 9, Yarra’s Edge, Docklands Description of Works: Principal Contractor Project; Soil Remediation and Removal Works. Excavate all contaminated and unsuitable CIS material and remove from site. Bulk filling works to proposed Foundation Piling levels, including pile break-back, spoil removal and maintenance works. Works also included batter stabilisation and raising of the sea-wall to assist river …